2016-01-26 - 23748 - Spec - Activate ASI (209050) for SNC #ProductionBreakFix #sncsup

2016-01-26 - 23748 - Service Request - Setup New ASI Vendor for SNC System

Problem Summary


Setup new vendor (209050) ASI in SNP System.

Admin Info


Purpose
Setup New ASI Vendor for SNC system
Requested by
Jingsha
Issue Date
01-26-2016
Resolved by
Adithya
Resolved Date
01-26-2016
Document Status
Complete

Detailed Problem Description

(Include Screen Shots if required )

Setup new vendor (209050) ASI in SNP System.


Solution Analysis and Recommendations

(Include Screen Shots if required)

- Setup the condition records in ECC to trigger ZSNC output type.
- Check the crystal report if it is generating the input file for the customer Master Data transfer (CIM) by vendor, if so we may have to add the new vendor.
- Update Variant to include new vendor ID in PO Push
- Update Variant to include new vendor ID in Inbound Delivery
- CIF the Vendor master (Vendor master data transfer).
- Create the Transportation lane combination with all the plants which we would think we may send the POs
- After Transportation lane Create move Po(Create Preliminary PO in ECC before creating number range for WO and ASN)
- Check of the phase master would be working fine for the new vendor.
- Schedule ASN job in SNC to include new vendor
- Push Preliminary PO to SNC
- Create number ranges for the Work Order creation & ASN.
- Assign user IDs to vendor number for Factory users in .NET
- Create the upload profile using the designated vendor ID
- Create the download profile using the designated vendor ID
- Schedule the download job


Resolution


Carried out all the steps in DEV and Ran full SNC cycle and repeated all these steps in SNP to setup new Vendor in SNP