Problem Summary
Setup new vendor (209050) ASI in SNP System.
Admin Info
Purpose
|
Setup New ASI Vendor for SNC system
|
Requested by
|
Jingsha
|
Issue Date
|
01-26-2016
|
Resolved by
|
Adithya
|
Resolved Date
|
01-26-2016
|
Document Status
|
Complete
|
Detailed Problem Description
(Include Screen Shots if required )
Setup new vendor (209050) ASI in SNP System.
Solution Analysis and Recommendations
(Include Screen Shots if required)
- Setup the condition records in ECC to trigger ZSNC output type.
- Check the crystal report if it is generating the input file for the customer Master Data transfer (CIM) by vendor, if so we may have to add the new vendor.
- Update Variant to include new vendor ID in PO Push
- Update Variant to include new vendor ID in Inbound Delivery
- CIF the Vendor master (Vendor master data transfer).
- Create the Transportation lane combination with all the plants which we would think we may send the POs
- After Transportation lane Create move Po(Create Preliminary PO in ECC before creating number range for WO and ASN)
- Check of the phase master would be working fine for the new vendor.
- Schedule ASN job in SNC to include new vendor
- Push Preliminary PO to SNC
- Create number ranges for the Work Order creation & ASN.
- Assign user IDs to vendor number for Factory users in .NET
- Create the upload profile using the designated vendor ID
- Create the download profile using the designated vendor ID
- Schedule the download job
Resolution
Carried out all the steps in DEV and Ran full SNC cycle and repeated all these steps in SNP to setup new Vendor in SNP